04 / HUNTER RELEASE GATES
NO SAFETY-CRITICAL
“GOOD ENOUGH.”
Internal decision gates, not a claim that a single checklist makes a vessel compliant. The responsible qualified person for each system still signs off the work.
01 / CLASSIFYVessel and use identifiedPleasure, commercial, fishing, passenger or other status; dimensions, tonnage and intended operating conditions recorded.
02 / SOURCECurrent requirements identifiedApplicable Canadian rule/standard plus ABYC/ISO working references and current OEM installation documentation.
03 / ENGINEERStructural or system design resolvedMeasurements, load paths, material schedule, diagrams and required professional engineering completed before irreversible work.
04 / BUILDQualified installationCorrect materials, tools, torque, surface preparation, routing, protection and trained personnel documented.
05 / TESTCommissioning evidencePressure/leak/electrical/functional tests and OEM commissioning steps captured where applicable.
06 / RELEASERecords stay with the boatParts, serials, drawings, photos, settings, test results, manuals, certifications and unresolved exceptions remain in the vessel dossier.